Before you start
Rule editing needs task-rule management permission. Confirm the selected property, units and responsible people.
-
Open Tasks settings and automatic-task rules, then select the arrival or departure anchor and its timing. The rule needs a defined event so its work is attached to the relevant part of the stay.
Choose the stay event RulesPreviewArrival or departure
Rule anchorTasks & tracking
Offset from the selected event- Rule anchor
- Arrival or departure
-
Choose the units, supported assignment and task instructions together. Preview the rule before enabling it, including any required evidence, so generated work has a useful operational scope.
Define the work and assignment To do1Replace lampSofia · Fri 23 OctIn progress1Repair water heaterMateo · Unit 402Done1Restock linenLuz · Unit 402- Assignment
- Responsible people and evidence
-
When a booking moves or cancels, inspect the existing generated work. Tasks already touched by the team may need review instead of silent rescheduling, preserving the context of work in progress.
Follow changed stays RulesHistory- Stay changeMoved or cancelled booking1
- Existing workReview touched tasks2
Rule-generated tasks are not proof that an inspection happened. Completion and evidence still belong to the team.
- Stay change
- Moved or cancelled booking
Check the result
Qualifying stays have the rule’s task and timing; ineligible stays have no task from that rule, and touched work keeps any required review visible.
Limits and prerequisites
Rule-generated tasks are not proof that an inspection happened. Completion and evidence still belong to the team.

