Before you start
Select the operating date and physical unit. Status changes and planning overrides require their specific permissions.
-
Open Cleaning, select the operating date and physical unit, and compare departures with expected arrivals. This reveals the time available for turnover before assigning work or interpreting a status.
Read the turnover window CalendarCoverageTEAM080910111213141516LuzMateoSofiaArrival · 402 · 15:00- Cleaning plan
- Date and physical unit
-
Changing cleaning status needs its own permission; courtesy overrides and plan changes need planning permission. Choose the action that matches the intended change rather than treating a status update as a new plan.
Use the right planning control TEAM080910111213141516LuzMateoSofiaArrival · 402 · 15:00- Plan overrides
- Planning permission
-
Read the assignment alongside shifts and leave, then inspect any pending review or channel release. A recorded cleaning state does not establish that a provider accepted an availability change.
Compare capacity and readiness Illustrative workflowEnough time for the day’s work? Casa Verde · Laureles
150 minestimated cleaning work- Available shift time
- 120 min
- Estimated shortfall
- 30 min
Review the 30-minute gap and adjust coverage or assignments.
- Capacity
- Assignment, shifts and leave
Check the result
The cleaning plan shows the unit’s assignment and current status for the selected day, including any pending review or channel-release state.
Limits and prerequisites
A proposed assignment does not prove availability, completed cleaning or passed inspection.

